Electrical and Instrumentation

An industry leader in construction, maintenance and fabrication serving the oil, gas, power, petrochemical and heavy oil industries.

From intelligent planning through expert commissioning to complete service and maintenance, ZSR Vortices Electrical and Instrumentation services is passionately dedicated to helping you build, optimize, manage and maintain your systems.  

We offer comprehensive service solutions for the calibration, maintenance and trouble-shooting of electronic and mechanical process instrumentation and controls. 

Our core products and services include:

  • Electrical and Instrumentation
  • Construction Services
  • Maintenance Services
  • Modular Systems
Past Electrical and Instrumentation Projects(Partial List)

DESCRIPTION OF WORK(Click For Detail)

Jan 2015 - Present

DESCRIPTION OF WORK :
__________________________

Provision for DED and SITC for FGS Replacement and Upgrade at OGT PCSB

Client: TRISYSTEMS ENGINEERING
SDN BHD

Oct 2014 – Present

DESCRIPTION OF WORK :
__________________________

Engineering, Procurement, Construction and Commissioning of KR1 Tank Overfill Protection Project

Client: BERKAT HONEYWELL ENGINEERING SDN BHD

Sept 2014

DESCRIPTION OF WORK :
__________________________

Procurement, Construction and Commissioning of KR1 and System Rejuvenation Instrument Compressor, K-1101 & K-1102 AB Project

Client: BERKAT HONEYWELL ENGINEERING SDN BHD

Sept 2014

DESCRIPTION OF WORK :
__________________________

Engineering, Procurement, Construction and Commissioning of KR1 F-101 Project

Client: BERKAT HONEYWELL ENGINEERING SDN BHD

Sept 2014

DESCRIPTION OF WORK :
__________________________

Demolition and Installation of 3 Nos of Control Valve at Aux. Boiler CDU at PPTSB

Client: SANGGUL EMAS SDN BHD

Aug 2014

DESCRIPTION OF WORK :
__________________________

Demolish Internal Component K-4001 Panel and Install New FCS at PPTSB

Client: AUTOMATION CONTROL SYSTEM SDN BHD

Apr 2014

DESCRIPTION OF WORK :
__________________________

Procurement, Construction and Commissioning of KR2 Furnace Project – F22801 at PPTSB

Client: TRISYSTEMS ENGINEERING
SDN BHD

Mar 2014

DESCRIPTION OF WORK :
__________________________

Manpower Supply for Install 4 Units of New COSMOS Gas Detector at PPTSB

Client: INDUSTRIAL MINERVA SDN BHD

Sept 2013

DESCRIPTION OF WORK :
__________________________

Manpower Supply for Replace Part HIS-VNET of DCS at Control Room at Petronas Ammonia Sdn Bhd

Client: YOKOGAWA KONTROL (M)
SDN BHD

Mar 2013

DESCRIPTION OF WORK :
__________________________

Supply Manpower for Dulang-B

Client: JM POWER

Feb 2013

DESCRIPTION OF WORK :
__________________________

Installation of GC and Network Panel at PDH Gebeng

Client: YOKOGAWA KONTROL (M) SDN BHD

Feb 2013

DESCRIPTION OF WORK :
__________________________

Manpower Supply for Booster Compressor Project for Carigali HESS

Client: EPIC MUSTHARI SDN BHD

Feb 2013

DESCRIPTION OF WORK :
__________________________

DCS upgrade at Kemaman Bitumen Company

Client: YOKOGAWA KONTROL (M)
SDN BHD

Jan 2013

DESCRIPTION OF WORK :
__________________________

Design, Fabrication, Install, Testing and Commissioning of MRU Panel at OGT, Kerteh.

Client: PETRONAS CARIGALI SDN BHD 

Jan 2013

DESCRIPTION OF WORK :
__________________________

DCS upgrade at Kemaman Bitumen Company

Client: YOKOGAWA KONTROL (M) SDN BHD 

Jan 2013

DESCRIPTION OF WORK :
__________________________

Manpower Supply (DCS System Installation and Wiring Works) for Mini Plant At Kimanis Training Centre, Membakut Sabah.

Client: FOXBORO (M) SDN BHD

Jan 2013

DESCRIPTION OF WORK :
__________________________

Installation Of Nuclear Level Transmitters At PSR-1, PPMSB

Client: PPMSB

Dec 2012

DESCRIPTION OF WORK :
__________________________

Installation of Flame and Gas Detectors at PPTSB

Client: PPTSB

Nov 2012

DESCRIPTION OF WORK :
__________________________

Panel Modification works at DOVECHEM, Kuantan

Client: YOKOGAWA KONTROL (M)
SDN BHD

Nov 2012

DESCRIPTION OF WORK :
__________________________

Metering Skid Upgrade at GPP-A

Client: EMERSON PROCESS MANAGEMENT SDN BHD 

Oct 2012

DESCRIPTION OF WORK :
__________________________

DCS Installation and Wiring Works At ADTEC, Kemaman.

Client: YOKOGAWA KONTROL (M)
SDN BHD

Oct 2012

DESCRIPTION OF WORK :
__________________________

Design, Fabricate, Supply, Install, Testing and Commissioning Mini Plant At Kimanis Training Centre, Membakut Sabah.

Client: FOXBORO (M) SDN BHD

Sept 2012

DESCRIPTION OF WORK :
__________________________

DCS Wiring Modification and termination work at PPTSB.

Client: YOKOGAWA KONTROL (M) SDN BHD

Sept 2012

DESCRIPTION OF WORK :
__________________________

To Replace PD meter to coriolis flow meter at Resak Platform

Client: ENDRESS+HAUSER SB

Aug 2012

DESCRIPTION OF WORK :
__________________________

 To Supply, Install, Testing and Commissioning CCTV System at Export Terminal

Client: PETRONAS GAS BERHAD

Aug 2012

DESCRIPTION OF WORK :
__________________________

Installation of Instrument Transmitters at KR-2 PPTSB

Client: ENDRESS+HAUSER SDN BHD

July 2012

DESCRIPTION OF WORK :
__________________________

To Perform instrumentation validation

Client: SIME DARBY SDN BHD

July 2012

DESCRIPTION OF WORK :
__________________________

Installation of NIR Analyzer and Local Panel At PP(T)SB.

Client: YOKOGAWA KONTROL (M) SDN BHD

June 2012

DESCRIPTION OF WORK :
__________________________

Supply and Install Shutdown Valves Accessories

Client: OFFSHORE AVENUE SDN BHD

June 2012

DESCRIPTION OF WORK :
__________________________

Manpower Supply For Dulang-B

Client: MATCO MALAYSIA

May 2012

DESCRIPTION OF WORK :
__________________________

U222 NHTU MODIFICATION PROJECT

Client: EPIC MUSTHARI SDN BHD

May 2012

DESCRIPTION OF WORK :
__________________________

Installation of GC and Local Control Panel at GPP-B

Client: YOKOGAWA KONTROL (M) SDN BHD

Apr 2012

DESCRIPTION OF WORK :
__________________________

Installation of Instrument Transmitters at KR-2 PPTSB

Client: ENDRESS+HAUSER SDN BHD

Apr 2012

DESCRIPTION OF WORK :
__________________________

Relocation of the DCS Marshalling and System Cabinet at INSTEP Batu Rakit

Client: YOKOGAWA KONTROL (M) SDN BHD

Mar 2012

DESCRIPTION OF WORK :
__________________________

Design, Fabricate and Install the Local Panel at INSTEP Batu Rakit

Client: YOKOGAWA KONTROL (M) SDN BHD

Mar 2012

DESCRIPTION OF WORK :
__________________________

EPCC For Demin Water Supply from CUFK to EMSB, Kertih

Client: BIJAK AKTIF SDN BHD

Mar 2012

DESCRIPTION OF WORK :
__________________________

Troubleshoot the CCTV and PIDS System at ET

Client: PETRONAS GAS BERHAD

Feb 2012

DESCRIPTION OF WORK :
__________________________

Design and Fabricate the Test Bench for Talisman Energy Sdn Bhd

Client: EPIC MUSTHARI SDN BHD

Feb 2012

DESCRIPTION OF WORK :
__________________________

EPCC For Installation of Fire Hydrant at Onshore Gas Terminal, Kertih

Client: EPIC MUSTHARI SDN BHD

Feb 2012

DESCRIPTION OF WORK :
__________________________

Manpower Supply For OSC Shutdown

Client: PETRONAS GAS BERHAD

Jan 2012

DESCRIPTION OF WORK :
__________________________

Replacement of 6 Nos. of Control Valves at Shell LOBP at Port Dickson

Client: FOXBORO (M) SDN BHD

Jan 2012

DESCRIPTION OF WORK :
__________________________

Manpower Supply For Dulang-B

Client: PETRONAS CARIGALI SDN BHD

Dec 2012

DESCRIPTION OF WORK :
__________________________

Supply Manpower (Instrument Technicians and Fitters)for Polyplastics Asia Pasific Shutdown

Client: YOKOGAWA KONTROL (M) SDN BHD

Dec 2011

DESCRIPTION OF WORK :
__________________________

To fabricate pipe spool and Install Vortex Meters At CUF Gebeng

Client: EMERSON PROCESS MANAGEMENT (M) SDN BHD

Nov 2011

DESCRIPTION OF WORK :
__________________________

To Install Radar Level Transmitter At PPT(S)B

Client: ENDRESS+HAUSER SDN BHD

Nov 2011

DESCRIPTION OF WORK :
__________________________

To Supply and Install enclosure for TDL analyser

Client: YOKOGAWA KONTROL (M) SDN BHD

OCT 2011

DESCRIPTION OF WORK :
__________________________

To Supply and Install MOS key

Client: YOKOGAWA KONTROL (M) SDN BHD

OCT 2011

DESCRIPTION OF WORK :
__________________________

To Supply and install RS485 Cable at Petronas INSTEP, Batu Rakit, Terengganu

Client: YOKOGAWA KONTROL (M) SDN BHD

SEPT 2011

DESCRIPTION OF WORK :
__________________________

Installation of 4 Nos. of Gas Detectors at PP(T) SB, Kertih

Client: INDUSTRIAL MINERVA SDN BHD

SEPT 2011

DESCRIPTION OF WORK :
__________________________

To Supply and Install Eex’e’ Junction Box and TDL Analyser at EMSB

Client: YOKOGAWA KONTROL (M) SDN BHD

AUG 2011

DESCRIPTION OF WORK :
__________________________

Installation of Flow Transmitter at PASB

Client: YOKOGAWA KONTROL (M) SDN BHD

AUG 2011

DESCRIPTION OF WORK :
__________________________

Panel Modification works at DOVECHEM, Kuantan

Client: YOKOGAWA KONTROL (M) SDN BHD

SEPT 2011

DESCRIPTION OF WORK :
__________________________

To Supply and Install Eex’e’ Junction Box and TDL Analyser at EMSB

Client: YOKOGAWA KONTROL (M) SDN BHD

JULY 2011

DESCRIPTION OF WORK :
__________________________

Installation of Vortex Flow Meter, Pressure Transmitter, Pressure Gauge and Bypass line at Sabah Gas Terminal, Kota Kinabalu

Client: FOXBORO (M) SDN BHD

JUNE 2011

DESCRIPTION OF WORK :
__________________________

To Supply, Installation and Commission Magnetic Flow Meter at Polyplastics (M) SDN BHD

Client: EMERSON PROCESS MANAGEMENT (M) SDN BHD

MAY 2011

DESCRIPTION OF WORK :
__________________________

Supply, Deliver, Install and Testing Two (2) Nos. of Test Bench At Petronas INSTEP Batu Rakit, Kuala Terengganu

Client: YOKOGAWA KONTROL (M) SDN BHD

MAY 2011

DESCRIPTION OF WORK :
__________________________

S4 Mini- Plant (Fieldbus Foundation Metering Skid) At Petronas INSTEP Batu Rakit, Kuala Terengganu

Client: YOKOGAWA KONTROL (M) SDN BHD 

APRIL 2011

DESCRIPTION OF WORK :
__________________________

Supply Manpower (Instrument Technicians and Fitters)for EPEMSB Stop Pit Turnaround 2011

Client: YOKOGAWA KONTROL (M) SDN BHD

FEB 2011

DESCRIPTION OF WORK :
__________________________

Provision of Office Renovation including LAN network facilities

Client: YOKOGAWA KONTROL (M) SDN BHD

JAN 2011

DESCRIPTION OF WORK :
__________________________

Provision of Supply, Installation and Commission Magnetic Flow Meter at VINYL CLORIDE (M) SDN BHD

Client: EMERSON PROCESS MANAGEMENT (M) SDN BHD